Electricity transmission system (2040) according to the Slow Progression scenario from Portugal – ATTEST project
Données et ressources
-
Portuguese Transmission System 2040 - SlowZIP
The dataset contains information about the full transmission test network of...
Info additionnelle
Champ | Valeur |
---|---|
Producteur | Henrique Teixeira, Nuno Fonseca, Fernando Ribeiro, Leonel Carvalho, André Madureira, Filipe Soares |
Dernière modification | avril 22, 2022, 14:19 (TU) |
Créé le | février 15, 2022, 17:13 (TU) |
Citation | Teixeira, H., Fonseca, N., Ribeiro, F., Carvalho, L., Madureira, A., & Soares, F. (2022). Electricity transmission system (2040) according to the Slow Progression scenario from Portugal – ATTEST project [Data set]. INESC TEC. https://doi.org/10.25747/37BM-WF43 |
DOI | https://doi.org/10.25747/37bm-wf43 |
dc.Coverage.Spatial | Network is geographically located in Portugal. |
dc.Coverage.Temporal | The network characteristics represent the circumstances of 2040. |
dc.Created | February, 2021 |
ddi.Software | Any text editor to read the network file. Matlab (with MatPower extension) or Pypower (Python) to test the network. |