Portuguese Transmission System_2040_Active
The dataset contains information about the full transmission test network of Portugal as in 2040, considering an Active Economy scenario which is more trending towards renewables and electrification of the economy. The grid topology has been anonymized and contains 312 nodes, 592 branches and 8 interconnections with Spain. It is operated at 400 kV, 220 kV and 150 kV. There are 299 generators, and a label classifies each of them according to the generation technology type (e.g., Fossil Gas, Wind Onshore, etc.). A network model (MatPower format) including the grid information and considering realistic assumptions for unknown data was built from scratch taking into account the available public data released by the Portuguese TSO as in 2020 and then updated to 2040 conditions.
Tälle resurssille ei ole luotu vielä yhtään näkymää.
Lisätietoa
Kenttä | Arvo |
---|---|
Data viimeksi päivitetty | 15. helmikuuta 2022 |
Metatieto viimeksi päivitetty | 15. helmikuuta 2022 |
Luotu | 15. helmikuuta 2022 |
Muoto | ZIP |
Lisenssi | Creative Commons Attribution Share-Alike |
Datastore active | False |
Has views | False |
Id | 352bd715-6200-49bd-aee5-4e274edfc1a2 |
Package id | d8e4b462-25f6-4ef8-9bd6-424f32b3501c |
Position | 0 |
State | active |
Url type | upload |