Electricity transmission system (2050) according to the Slow Progression scenario from Portugal – ATTEST project
Datos y Recursos
-
Portuguese Transmission System 2050 - SlowZIP
The dataset contains information about the full transmission test network of...
Información Adicional
Campo | Valor |
---|---|
Autor | Henrique Teixeira, Nuno Fonseca, Fernando Ribeiro, Leonel Carvalho, André Madureira, Filipe Soares |
Última actualización | abril 30, 2024, 12:33 (UTC) |
Creado | marzo 2, 2022, 15:13 (UTC) |
Citation | Teixeira, H., Fonseca, N., Ribeiro, F., Carvalho, L., Madureira, A., & Soares, F. (2022). Electricity transmission system (2050) according to the Slow Progression scenario from Portugal – ATTEST project [Data set]. INESC TEC. https://doi.org/10.25747/3DJ5-H546 |
DOI | https://doi.org/10.25747/3dj5-h546 |
Date of Creation | February, 2021 |
Software | Any text editor to read the network file. Matlab (with MatPower extension) or Pypower (Python) to test the network. |
Spatial Coverage | Network is geographically located in Portugal. |
Temporal Coverage | The network characteristics represent the circumstances of 2050. |