Daily profiles (2030) of load of an urban electricity distribution network form Portugal - ATTEST project
Datos y Recursos
-
Portuguese Distribution test network_03_2030ZIP
. The dataset contains information about a real Portuguese Distribution test...
Información Adicional
Campo | Valor |
---|---|
Autor | Nuno Fonseca, Henrique Teixeira, Fernando Ribeiro, André Madureira, Filipe Soares |
Última actualización | febrero 25, 2022, 16:45 (UTC) |
Creado | febrero 11, 2022, 16:26 (UTC) |
Citation | Fonseca, N., Teixeira, H., Ribeiro, F., Madureira, A., & Soares, F. (2022). Daily profiles (2030) of load of an urban electricity distribution network from Portugal – ATTEST project [Data set]. INESC TEC. https://doi.org/10.25747/MHRY-MA24 |
DOI | https://doi.org/10.25747/mhry-ma24 |
dc.Coverage.Spatial | Network is geographically located in an urban area. |
dc.Coverage.Temporal | The network characteristics represent the circumstances of 2030. Load profiles are expressed in intervals of 15 minutes for 12 typical days of the year: Business day, Saturday and Sunday for each season of the year. |
dc.Created | February, 2021 |
dc.Relation | The point of connection of this network with the Portuguese transmission system (shared under the framework of the ATTEST project – DOI XXXX Dataset to appear) is stablished at 60 kV level, more precisely at bus 2 of the distribution network or bus 110 of the transmission network. |
ddi.Software | Any text editor to read the network file. Excel to read and operate load, generation and flexibility profiles. Matlab (with MatPower extension) or Pypower (Python) to test the network. |