Part of the electricity transmission system from Croatia (10 nodes) – ATTEST project

This dataset was prepared under the framework of the ATTEST project, financed by the European Commission with grant number 864298. The dataset contains information about part of the real Transmission grid, totally anonymized, located in Croatia as in 2020. Two types of network files (including grid topology, nodes, generators, consumption, all of which connected by power lines or transformers) are provided. The network files (MatPower and PSS/E formats) includes a “snapshot” or “steady-state” at a given time with a converged power flow solution. The grid, which is operated at 400 kV, 220 kV, and 110, has 10 nodes, 18 branches and 4 generators.

Daten und Ressourcen

Zusätzliche Informationen

Feld Wert
Autor Dajana Vrbicic Tendera, Lovro Klepo, Ana Jukic
Zuletzt aktualisiert April 30, 2024, 12:37 (UTC)
Erstellt März 4, 2022, 16:32 (UTC)
Citation Vrbicic Tendera, D., Klepo, L., & Jukic, A. (2022). Part of the electricity transmission system from Croatia (10 nodes) – ATTEST project [Data set]. INESC TEC. https://doi.org/10.25747/0V8R-Z261
DOI https://doi.org/10.25747/0v8r-z261
Date of Creation February, 2021
Software Any text editor to read the network files. Matlab (with MatPower extension) or Pypower (Python) to test the network (“.m” extension) and PSS/E to test the network (“.sav” extension).
Spatial Coverage Network is geographically located in Croatia.
Temporal Coverage The network characteristics represent the circumstances of 2020. Load profiles are expressed in intervals of 15 minutes for 12 typical days of the year.