Daily load and flexibility profiles (2030) according to the Active Economy scenario of the electricity transmission system from Portugal – ATTEST project
Data og ressourcer
-
Portuguese Transmission System 2030 ActiveZIP
The dataset contains information about the full transmission test network of...
Yderligere info
Felt | Værdi |
---|---|
Forfatter | Henrique Teixeira, Nuno Fonseca, Fernando Ribeiro, Leonel Carvalho, André Madureira, Filipe Soares |
Last Updated | april 22, 2022, 14:17 (UTC) |
Oprettet | februar 15, 2022, 10:50 (UTC) |
Citation | Teixeira, H., Fonseca, N., Ribeiro, F., Carvalho, L., Madureira, A., & Soares, F. (2022). Daily load and flexibility profiles (2030) according to the Active Economy scenario of the electricity transmission system from Portugal – ATTEST project [Data set]. INESC TEC. https://doi.org/10.25747/42WH-ZT58 |
DOI | https://doi.org/10.25747/42wh-zt58 |
dc.Coverage.Spatial | Network is geographically located in Portugal. |
dc.Coverage.Temporal | The network characteristics represent the circumstances of 2030. Load, generation and flexibility data are expressed in intervals of 1 hour. |
dc.Created | February, 2021 |
ddi.Software | Any text editor to read the network file. Excel to read and operate load, generation and flexibility profiles. Matlab (with MatPower extension) or Pypower (Python) to test the network. |