Croatian Distribution test network_02_2020
The dataset contains information about a real Distribution network, totally anonymized, located in Croatia as in 2020. A network file (including grid topology, nodes, generators, consumption, all of which connected by power lines or transformers) and auxiliary files are provided. The network file (MatPower format) includes a “snapshot” or “steady-state” at a given time with a converged power flow solution. The grid, which is operated at 110 kV, 35 kV, 20 kV and 10 kV, has 25 nodes, 34 branches and 107 generators modelled as negative loads. The auxiliary load data comprises 12 typical days representing the combination of each season and the type of day (business day, Saturday, Sunday) gathering the active and reactive consumption at specific feeders of the network in intervals of 15 minutes. Besides, a single line diagram of the network is also provided.
이 리소스를 위해 생성된 뷰가 아직 없습니다.
추가 정보
필드 | 값 |
---|---|
마지막으로 업데이트된 데이터 | 2022년 3월 4일 |
마지막으로 업데이트된 메타데이터 | 2022년 3월 4일 |
생성됨 | 2022년 3월 4일 |
포맷 | ZIP |
라이센스 | Creative Commons Attribution Share-Alike |
Datastore active | False |
Has views | False |
Id | 1b3bf706-9070-4abc-8874-dd0b43dc0291 |
Package id | d4b64a8d-8385-4ff1-8568-d5e62521d0bb |
Position | 0 |
State | active |
Url type | upload |