Croatian Distribution test network_02_2020
The dataset contains information about a real Distribution network, totally anonymized, located in Croatia as in 2020. A network file (including grid topology, nodes, generators, consumption, all of which connected by power lines or transformers) and auxiliary files are provided. The network file (MatPower format) includes a “snapshot” or “steady-state” at a given time with a converged power flow solution. The grid, which is operated at 110 kV, 35 kV, 20 kV and 10 kV, has 25 nodes, 34 branches and 107 generators modelled as negative loads. The auxiliary load data comprises 12 typical days representing the combination of each season and the type of day (business day, Saturday, Sunday) gathering the active and reactive consumption at specific feeders of the network in intervals of 15 minutes. Besides, a single line diagram of the network is also provided.
Non è stata ancora creata alcuna vista per questa risorsa.
Informazioni supplementari
Campo | Valore |
---|---|
Data last updated | 4 marzo 2022 |
Metadata last updated | 4 marzo 2022 |
Creato | 4 marzo 2022 |
Formato | ZIP |
Licenza | Creative Commons Attribution Share-Alike |
Datastore active | False |
Has views | False |
Id | 1b3bf706-9070-4abc-8874-dd0b43dc0291 |
Package id | d4b64a8d-8385-4ff1-8568-d5e62521d0bb |
Position | 0 |
State | active |
Url type | upload |