Daily profiles (2020) of load of a electricity distribution network (40 nodes) from Croatia – ATTEST project
Data e Risorse
-
Croatian Distribution test network_01_2020ZIP
The dataset contains information about a real Distribution network, totally...
Informazioni addizionali
Campo | Valore |
---|---|
Autore | Martin Bolfek |
Ultimo aggiornamento | marzo 4, 2022, 16:36 (UTC) |
Creato | marzo 3, 2022, 17:02 (UTC) |
Citation | Bolfek, M. (2022). Daily profiles (2020) of load of a electricity distribution network (40 nodes) from Croatia – ATTEST project [Data set]. INESC TEC. https://doi.org/10.25747/Z9QP-8D97 |
DOI | https://doi.org/10.25747/z9qp-8d97 |
dc.Coverage.Spatial | Network is geographically located in Croatia. |
dc.Coverage.Temporal | The network characteristics represent the circumstances of 2020. Load profiles are expressed in intervals of 15 minutes for 12 typical days of the year: Business day, Saturday and Sunday for each season of the year. |
dc.Created | February, 2021 |
dc.Relation | The point of connection of this network with the Croatian transmission system (shared under the framework of the ATTEST project - DOI to appear) is stablished at buses 1,9 and 31 of the distribution network and buses 29, 01 and 19 of the transmission network, respectively. |
ddi.Software | Any text editor to read the network file. Excel to read and operate load profiles. Matlab (with MatPower extension) or Pypower (Python) to test the network. |