Croatian Transmission grid_02_2020

URL: https://rdm.inesctec.pt/dataset/76cc34e6-0bd8-4c9d-b9c9-642ccd2637dc/resource/3138989f-25ce-46d0-89c8-e4bb7a254e5c/download/41---hrtx022020.zip

The dataset contains information about part of the real Transmission grid, totally anonymized, located in Croatia as in 2020. Two types of network files (including grid topology, nodes, generators, consumption, all of which connected by power lines or transformers) are provided. The network files (MatPower and PSS/E formats) includes a “snapshot” or “steady-state” at a given time with a converged power flow solution. The grid, which is operated at 400 kV, 220 kV, and 110, has 29 nodes, 38 branches and 17 generators.

There are no views created for this resource yet.

Additional Information

Field Value
Last updated May 6, 2022
Created May 6, 2022
Format ZIP
License Creative Commons Attribution Share-Alike
created15 days ago
formatZIP
id3138989f-25ce-46d0-89c8-e4bb7a254e5c
last modified15 days ago
on same domain1
package id76cc34e6-0bd8-4c9d-b9c9-642ccd2637dc
revision idbf7a30b2-11ff-489d-9bf2-2700d52bae7f
stateactive
url typeupload