Portuguese Transmission System 2030 Slow
The dataset contains information about the full transmission test network of Portugal as in 2030, considering a Slow Progression scenario which represents a lower demand increase and less renewables in the generation. The grid topology has been anonymized and contains 312 nodes, 592 branches and 8 interconnections with Spain. It is operated at 400 kV, 220 kV and 150 kV. There are 299 generators, and a label classifies each of them according to the generation technology type (e.g., Fossil Gas, Wind Onshore, etc.). A network model (MatPower format) including the grid information and considering realistic assumptions for unknown data was built from scratch taking into account the available public data released by the Portuguese TSO as in 2020 and then updated to 2030 conditions. The auxiliary spreadsheet contains the following hourly data: load data, generator status obtained from unit commitment, regulated voltage magnitude setpoint of each generator, transformer tap ratio and aggregated flexibility per consumption node.
There are no views created for this resource yet.
Additional Information
Field | Value |
---|---|
Data last updated | February 15, 2022 |
Metadata last updated | February 15, 2022 |
Created | February 15, 2022 |
Format | ZIP |
License | Creative Commons Attribution Share-Alike |
Datastore active | False |
Has views | False |
Id | a129e1ae-262f-409b-b97a-622d083bbbe7 |
Package id | 79101f4d-fabd-40a0-af16-326460afca37 |
Position | 0 |
State | active |
Url type | upload |