Portuguese Transmission System 2020
The dataset contains information about the full transmission test network of Portugal as in 2020. The grid topology has been anonymized and contains 304 nodes, 557 branches and 7 interconnections with Spain. It is operated at 400 kV, 220 kV and 150 kV. There are 270 generators, and a label classifies each of them according to the generation technology type (e.g., Fossil Gas, Wind Onshore, etc.). A network model (MatPower format) including the grid information and considering realistic assumptions for unknown data was built from scratch taking into account the available public data released by the Portuguese TSO. Furthermore, this model contains a built-in snapshot regarding the 2019 winter peak. Considering the day when this peak load occurred, the auxiliary spreadsheet contains the following hourly data: load data, generator status obtained from unit commitment, regulated voltage magnitude setpoint of each generator, transformer tap ratio, power transformer data, power lines/cables data and aggregated flexibility per consumption node.
There are no views created for this resource yet.
Additional Information
Field | Value |
---|---|
Data last updated | February 15, 2022 |
Metadata last updated | February 15, 2022 |
Created | February 15, 2022 |
Format | ZIP |
License | Creative Commons Attribution Share-Alike |
Datastore active | False |
Has views | False |
Id | a3ba1002-006e-4f97-8a20-18a32ed0caa9 |
Package id | 064eb9a3-20d7-4fc6-b34a-ed30b0770e12 |
Position | 0 |
State | active |
Url type | upload |